Cowichan Valley Railway 0-4-0T No. 25
Duncan, BC, Canada
Location: BC Forest Discovery Center
Status: Overhaul
Posted: Jul 4, 2024 @ 09:07:27 by
change status to stored #25 was withdrawn for overhaul a month or two ago
Posted: Jul 15, 2007 @ 13:07:42 by Pat
The boiler pressure on this engine is its origonal 150 psi, the boiler was extensively rebuilt during 1995 to 1997, and it has a new all welded barrel rivetted to the origional firebox section and dome. the front tubesheet, tubes and all stays were renewed at that time. It is lettered for one of its past owners the Magoffin construction company which was one of the contractors involved in the construction of the Canadian Northern railway in the Fraser canyon, this locomotive is believed to have been used in that construction.
Posted: Jul 25, 2005 @ 17:07:42 by Tyler

Boiler Pressure: 140psi when orignally built. Currently 150psi.